When is it allowed to walk on the newly jointed surface?
- 27/08/2025 -
At temperatures around 20°C, the surface is walkable after 3 hours and drivable after 3 days.
At temperatures around 20°C, the surface is walkable after 3 hours and drivable after 3 days.